Section 4
Unpacking, inspecting and storing
4.1
Removing transport packaging
AMU0600514 v5
IEDs require careful handling.
1.
Examine the delivered products to ensure that they have not been damaged during the
transport.
2.
Remove the transport packing carefully without force.
The cardboard packaging material is 100% recyclable.
4.2
Inspecting the product
4.2.1
Identifying the product
AMU0600513 v5
1.
Locate the IED's order number from the label attached to the IED's case.
2.
Compare the IED's order number with the ordering information to verify that the received
product is correct.
4.2.2
Checking delivery items
GUID-2A6D8F5A-470F-40D1-9EAE-60DE4DD85EE6 v1
Check that all items are included in the delivery in accordance with the delivery documents.
4.2.3
Inspecting the IED
GUID-F6333353-F05D-4B41-BE44-5CE5274E788E v2
•
Check the IED to see if any damage occurred during transportation.
4.2.4
Returning an IED damaged in transit
GUID-966A05ED-CD30-4F66-957E-00FF38943A73 v5
If damage has occurred during transport, appropriate actions must be taken against the latest carrier.
Please inform the nearest Hitachi Power Grids office or representative. Notify Hitachi Power Grids
immediately if there are any discrepancies in relation to the delivery documents.
4.3
Storing
GUID-1DC9D33D-DC62-438B-9333-3BB354164CBC v7
Storing of the IED before installation must be done in the original transport packaging in a dry and
dust free place. Storage temperature must be within the range of -40° C to +70° C. The average high
temperature is recommended to be less than +40° C, to minimize component ageing.
1MRK 514 030-UEN Rev. C
Section 4
Unpacking, inspecting and storing
Switchgear control unit SAM600-IO
11
Installation manual
© 2017 - 2021 Hitachi Power Grids. All rights reserved