Section 1
Section 2
A1A2_DC(BS)
B1B2_DC(BS)
BB_ES
BB_ES
DB_BUS
(WA1)A1
(WA2)B1
B2
A2
en04000511.vsd
DB_BUS
IEC04000511 V1 EN-US
Figure 119:
Busbars divided by bus-section disconnectors (circuit breakers)
To derive the signals:
Signal
BB_DC_OP
All disconnectors of this part of the busbar are open.
VP_BB_DC
The switch status of all disconnectors on this part of the busbar are valid.
EXDU_BB
No transmission error from any bay that contains the above information.
These signals from each double-breaker bay (DB_BUS) are needed:
Signal
QB1OPTR
QB1 is open.
QB2OPTR
QB2 is open.
VPQB1TR
The switch status of QB1 is valid.
VPQB2TR
The switch status of QB2 is valid.
EXDU_DB
No transmission error from the bay that contains the above information.
These signals from each bus-section disconnector bay (A1A2_DC) are also needed.
For B1B2_DC, corresponding signals from busbar B are used. The same type of
module (A1A2_DC) is used for different busbars, that is, for both bus-section
disconnectors A1A2_DC and B1B2_DC.
Signal
DCOPTR
The bus-section disconnector is open.
VPDCTR
The switch status of bus-section disconnector DC is valid.
EXDU_DC
No transmission error from the bay that contains the above information.
The logic is identical to the double busbar configuration described in section
“Signals in single breaker arrangement”.
12.4.7.4
Signals in 1 1/2 breaker arrangement
M15053-123 v4
The busbar earthing switch is only allowed to operate if all disconnectors of the
bus-section are open.
Section 12
1MRK 506 375-UEN A
Control
284
Railway application RER670 2.2 IEC
Application manual
Summary of Contents for RELION RER670
Page 1: ...RELION 670 SERIES Railway application RER670 Version 2 2 IEC Application manual ...
Page 2: ......
Page 22: ...16 ...
Page 48: ...42 ...
Page 70: ...64 ...
Page 80: ...74 ...
Page 100: ...94 ...
Page 210: ...204 ...
Page 364: ...358 ...
Page 384: ...378 ...
Page 468: ...462 ...
Page 494: ...488 ...
Page 504: ...498 ...
Page 505: ...499 ...