8.4
Sending the IED for repair
In case of product problems, contact the nearest ABB office or representative for
consultation and instructions.
8.5
Exchanging the IED
To exchange the IED with another identical unit, remove the IED and install the new
one. Contact your local ABB for information about exchangeable units.
Section 8
1MRK514019-UEN A
Removing, repairing and exchanging
86
670 series 2.0 IEC
Installation manual
Summary of Contents for Relion 670 2.0 IEC Series
Page 1: ...Relion Protection and Control 670 series 2 0 IEC Installation manual ...
Page 2: ......
Page 10: ...4 ...
Page 18: ...12 ...
Page 24: ...18 ...
Page 42: ...36 ...
Page 88: ...82 ...
Page 100: ...94 ...
Page 109: ...103 ...