7
A SP M E T ER S O L I D CO R E
Commissioning
1. Install according to instructions in mechanical installation.
2. Provide control power to main circuit board.
3. Configure installation mode using Modbus register 6.
4. Configure CT scaling.
5. Configure alarms.
6. Configure demand.
Download the free configuration tool “NetConfig” from
www.veris.com/modbus_downloads.aspx to commission
the ASPMETER for operation.
—
ASPMETER solid core
Data output
Monitoring at mains
ASPMETERA ASPMETERB
ASPMETERC
Current per phase
•
•
•
Max. current per phase
•
•
•
Current demand per phase
•
•
•
Max. current demand per phase
•
•
•
Current phase angle
•
•
–
Energy (kWh) per phase
•
•
–
Real power (kW) per phase
•
•
–
Apparent power (kVA)
•
•
–
Power factor total *
•
•
–
Power factor per phase
•
•
–
Voltage — L-L and average
•
•
–
Voltage — L-N and average
•
•
–
Frequency (phase A)
•
•
–
Monitoring at branch circuit
Current
•
•
•
Max. current
•
•
•
Current demand
•
•
•
Max. current demand
•
•
•
Current phase angle
•
•
–
Real power (kW)
•
–
–
Real power (kW) demand
•
–
–
Real power (kW) demand max.
•
–
–
Energy (kWh) per circuit
•
–
–
Power factor
•
–
–
Apparent power (kVA)
•
–
–
Modbus alarms
Voltage over/under
•
•
–
Current over/under
•
•
•
* Based on a 3-phase breaker rotation.
Blink code
Color and pattern
Status description
Green, once per second
Normal operation
Amber, once per second
Volts or amps clipping
Amber, twice per second
Invalid firmware image
Amber, three per second
Incorrect strips or strip order
Red, solid or blink
Device failure