Installation checklist 97
7
Installation checklist
Contents of this chapter
This chapter contains a list for checking the mechanical and electrical installation of the
inverter.
Checklist
Go through the checks below with another person. Obey the
given on
the first pages of this manual.
Check that…
MECHANICAL INSTALLATION
There is sufficient free space around the unit. (See page
.)
The ambient operating conditions are allowed. (See page
The unit is properly fastened to the floor and wall. (See
)
The cooling air is able to flow freely and cooling air volume is sufficient.
ELECTRICAL INSTALLATION
(See
The capacitors are reformed if stored over one year (refer to
Capacitor reforming
instructions
(3BFE64059629 [English]).
The inverter is grounded properly.
The AC line voltage matches the nominal output voltage of the inverter.
Summary of Contents for PVS800-57-0100kW-A
Page 1: ...ABB solar inverters Hardware manual PVS800 57 central inverters 100 to 1000 kW ...
Page 4: ......
Page 22: ...20 Safety instructions ...
Page 64: ...62 Operation principle and hardware description ...
Page 74: ...72 Mechanical installation ...
Page 90: ...88 Electrical installation PE PE PE ...
Page 124: ...122 Maintenance ...
Page 152: ...150 Dimension drawings Frame R7i 3AUA0000083128 ...
Page 153: ...Dimension drawings 151 AC output 3AUA0000083128 ...
Page 154: ...152 Dimension drawings 3AUA0000083128 One DC input Four DC inputs ...
Page 156: ...154 Dimension drawings R8i 8 DC inputs option 8H382 3AXD50000016935 ...
Page 157: ...Dimension drawings 155 R8i AC output terminals 3AXD50000016935 ...
Page 165: ...Dimension drawings 163 2 R8i AC output terminals 3AXD50000015007 ...
Page 173: ...Dimension drawings 171 3 R8i AC input terminals 3AXD50000015006 ...
Page 178: ...176 Dimension drawings ...
Page 180: ...Contact us www abb com solar 3AUA0000053689 Rev H EN EFFECTIVE 2014 07 09 ...