Mechanical installation 63
4
Mechanical installation
Contents of this chapter
This chapter describes the mechanical installation procedure of the inverter.
Checking the installation site
for allowable operating conditions, and
Dimensions, weights and free space requirements
on page
for requirements
for free space around the unit.
The floor
that the unit is installed on must be of non-flammable material, as smooth as
possible, and strong enough to support the weight of the unit. The floor flatness must be
checked with a spirit level before the installation of the cabinets into their final position. The
maximum allowed deviation from the surface level is 5 mm in every 3 metres. The
installation site should be levelled, if necessary, as the cabinet is not equipped with
adjustable feet.
Summary of Contents for PVS800-57-0100kW-A
Page 1: ...ABB solar inverters Hardware manual PVS800 57 central inverters 100 to 1000 kW ...
Page 4: ......
Page 22: ...20 Safety instructions ...
Page 64: ...62 Operation principle and hardware description ...
Page 74: ...72 Mechanical installation ...
Page 90: ...88 Electrical installation PE PE PE ...
Page 124: ...122 Maintenance ...
Page 152: ...150 Dimension drawings Frame R7i 3AUA0000083128 ...
Page 153: ...Dimension drawings 151 AC output 3AUA0000083128 ...
Page 154: ...152 Dimension drawings 3AUA0000083128 One DC input Four DC inputs ...
Page 156: ...154 Dimension drawings R8i 8 DC inputs option 8H382 3AXD50000016935 ...
Page 157: ...Dimension drawings 155 R8i AC output terminals 3AXD50000016935 ...
Page 165: ...Dimension drawings 163 2 R8i AC output terminals 3AXD50000015007 ...
Page 173: ...Dimension drawings 171 3 R8i AC input terminals 3AXD50000015006 ...
Page 178: ...176 Dimension drawings ...
Page 180: ...Contact us www abb com solar 3AUA0000053689 Rev H EN EFFECTIVE 2014 07 09 ...