
Electrical installation 83
6
Electrical installation
Contents of this chapter
This chapter describes the electrical installation process of the inverter.
Warnings
WARNING!
Only qualified electricians are allowed to do the work described in this
chapter. Obey the
on the first pages of this manual. If you
ignore the safety instructions, injury or death can occur.
Checking the insulation of the assembly
Inverter
Every inverter module has been tested for insulation between the main circuit and the
chassis (2700 V rms 50 Hz for 1 second) at the factory. Therefore, do not make any
voltage tolerance or insulation resistance tests eg, hi-pot or megger, on any part of the
inverter.
AC output cable
Check the insulation of the AC output cable according to local regulations before
connecting it to the inverter.
DC input cable(s)
Check the insulation of the DC input cable(s) according to local regulations before
connecting it to the inverter.
Summary of Contents for PVS800-57-0100kW-A
Page 1: ...ABB solar inverters Hardware manual PVS800 57 central inverters 100 to 1000 kW ...
Page 4: ......
Page 22: ...20 Safety instructions ...
Page 64: ...62 Operation principle and hardware description ...
Page 74: ...72 Mechanical installation ...
Page 90: ...88 Electrical installation PE PE PE ...
Page 124: ...122 Maintenance ...
Page 152: ...150 Dimension drawings Frame R7i 3AUA0000083128 ...
Page 153: ...Dimension drawings 151 AC output 3AUA0000083128 ...
Page 154: ...152 Dimension drawings 3AUA0000083128 One DC input Four DC inputs ...
Page 156: ...154 Dimension drawings R8i 8 DC inputs option 8H382 3AXD50000016935 ...
Page 157: ...Dimension drawings 155 R8i AC output terminals 3AXD50000016935 ...
Page 165: ...Dimension drawings 163 2 R8i AC output terminals 3AXD50000015007 ...
Page 173: ...Dimension drawings 171 3 R8i AC input terminals 3AXD50000015006 ...
Page 178: ...176 Dimension drawings ...
Page 180: ...Contact us www abb com solar 3AUA0000053689 Rev H EN EFFECTIVE 2014 07 09 ...