
Finalizing the installation
Contents of this chapter
This chapter describes how to finalize and check the installation of the PVS-175 medium
voltage station (MVS). Obey all local regulations.
WARNING!
Only an authorized electrician is permitted to install the cabling to the MVS. Obey
the
, and the local safety regulations. If ignored,
physical injury or death may occur, or cause damage to the equipment.
WARNING!
Do not do electrical installation work during a thunderstorm.
WARNING!
Make sure that all external cable entries are fully sealed to prevent entry of foreign
elements, such as animals and insects.
Finalizing the installation
•
Clean the MVS of all dirt.
•
Repair any damages to the paint surface. See section,
•
If not yet done, seal the cable entries, cover the cable entries with sand and sprinkle a
handful of cement over the sand. The cement hardens in a few days and it forms a
barrier against small animals and plant growth.
6
Finalizing the installation 49
Summary of Contents for PVS-175 Series
Page 1: ... ABB SOLAR INVERTERS PVS 175 medium voltage station Hardware manual ...
Page 2: ......
Page 4: ......
Page 8: ...8 ...
Page 14: ...14 ...
Page 26: ...26 ...
Page 32: ...32 ...
Page 40: ...6 Apply a layer of sealant around the hood border 40 Mechanical installation ...
Page 48: ...48 ...
Page 54: ...54 ...
Page 68: ...68 ...
Page 70: ......