9.6
Removing the compressor casing
u
Mark the casing position for assembly.
u
Measure radial clearance N before removing the compressor casing (72000) (see
u
Remove expansion bushes and threaded rods from the bearing casing.
Fig. 33: Removing the compressor casing
1. Loosen screws (72011) and remove together with fastening strips (72012).
2. Screw two swivel lifting eyes (01) into compressor casing (72000) and secure lifting gear.
3. Remove compressor casing (72000) and place on soft surface.
4. Loosen nuts (77022) and remove with washer (77021). Wall insert (77000) is loose.
5. Remove the O-ring (77005).