![ABB PST Series Installation And Commissioning Manual Download Page 47](http://html.mh-extra.com/html/abb/pst-series/pst-series_installation-and-commissioning-manual_3149047.webp)
47
1SFC132003M0201
&RQQHFWLRQ
&KDSWHU
3URJUDPPDEOHRXWSXWUHOD\.
WHUPLQDOVDQG
The output relay gives signal depending on the selected
function.
Default: Event
See Chapter 7 “Settings and configuration” for
programming.
1 Connect the cables to terminal 18, 19 and 20.
37&LQSXW
If the motor is protected by PTC elements, the cables shall
be connected to terminals PTC, see figure 24.
See Chapter 7 “Settings and configuration” for
programming.
)LJXUH 7HUPLQDOV
LISTED 7F39
IND. CONT
. EQ
.
1SF
A 894 007 R1002
IEC 947-4-2
Ie: 37-72A
Us: 100-250V
AC/DC
UL 508
Uc: 100-250V
AC/DC
FLA: 37-68A
Made in Sweden
Ue: 220-230 380-400 500 V
72:
AC-53a: 8-1.6: 80-6
In line 18,5 37 45
kW
Ue 208 220-240 440-480 V
In line 20 20 50 Hp
CAUTION
Fuse 250A
TYPOWER ZILOX
Max short circuit current 65kA
at 480V
Wire 1-8
Al Cu 75C only
, 35lb-in
Overload Capacity 1
15% of Continuous
PTC
Key-Pad
FELDBUSS
)LJXUH37&FRQQHFWLRQ
)LJXUH 7LJKWHQLQJWRUTXHVDQGFDEOHGLPHQVLRQVPP LQ
Summary of Contents for PST Series
Page 2: ...7KLV PDQXDO EHORQJV WR __________________________ ...
Page 6: ...1SFC132003M0201 6 1RWHV ...
Page 8: ...8 1SFC132003M0201 ...
Page 12: ...12 1SFC132003M0201 QWURGXFWLRQ KDSWHU ...
Page 14: ...1SFC132003M0201 14 ...
Page 18: ...18 1SFC132003M0201 ...
Page 30: ...30 1SFC132003M0201 HVFULSWLRQ KDSWHU 367 LJXUH LPHQVLRQV 367 PP PP LQ ...
Page 32: ...32 1SFC132003M0201 ...
Page 36: ...36 1SFC132003M0201 0RXQWLQJ KDSWHU ...
Page 38: ...38 1SFC132003M0201 ...
Page 50: ...50 1SFC132003M0201 ...
Page 62: ...62 1SFC132003M0201 ...
Page 98: ...98 1SFC132003M0201 ...
Page 113: ...113 1SFC132003M0201 KDSWHU 0DLQWHQDQFH Regular maintenance 115 0DLQWHQDQFH ...
Page 114: ...114 1SFC132003M0201 ...
Page 116: ...116 1SFC132003M0201 0DLQWHQDQFH KDSWHU ...
Page 158: ...158 1SFC132003M0201 ...
Page 168: ...168 1SFC132003M0201 ...
Page 177: ......