54 Electrical installation
Connection diagram
No. Description
No. Description
1a Standard & -S: 1 pair DC input screw
terminals and string combiner box
4
Remote control unit terminal X1
5
Remote monitoring terminal X2
1b -SX: 8 pairs of PV quick DC connectors
6
Clamp connections for cable shields
2
Additional PE terminal*
7
Option module SLOT 1 and SLOT 2
3
AC cable connector (PE, N, L1, L2, L3)
8
Control unit
* Required if the conductivity of the primary PE conductor is not sufficient. Refer to
on page
.
1
•
•
•
N
X1:1
Data +
X1:2
Data -
X1:3
GND
X1:4
+24 VDC
X1:5
GND
X1:6
REM_
CTL_ENA
X2:1
Data +
X2:2
Data -
X2:3
GND_A
SLOT 1
SLOT 2
DC +
DC -
DC 1+
DC 1-
DC 8+
DC 8-
PE
PE
N
L1
L2
L3
PE
N
L1
L2
L3
(PE)
1a
2
3
7
4
5
6
8
1b
Standard & -S
-SX
Summary of Contents for PRO-33.0-TL Series
Page 1: ...ABB solar inverters Product manual PRO 33 0 TL string inverters ...
Page 4: ......
Page 10: ...10 Table of contents ...
Page 32: ...32 Hardware description ...
Page 40: ...40 Installation requirements ...
Page 70: ...70 Electrical installation ...
Page 74: ...74 Installation checklist ...
Page 110: ...110 Maintenance ...
Page 134: ...134 Navigation map The navigation map ...
Page 136: ...Contact us www abb com solarinverters 3AUA0000123261 Rev B EN 2015 06 18 ...