background image

Ta 

-0

° 

+40

°

We reserve the right to make technical 
changes or modify the contents of this 
document without prior notice. With  
regard to purchase orders, the agreed  
particulars shall prevail. ABB AG does  
not accept any responsibility whatsoever 
for potential errors or possible lack of  
information in this document.

We reserve all rights in this document  
and in the subject matter and illustrations  
contained therein. Any reproduction,  
disclosure to third parties or utilisation of its 
contents – in whole or in parts – is forbidden 
without prior written consent of ABB AG. 
Copyright© 2017 ABB
All rights reserved

RPM 311 REV 

E

 8.11.2017

— 

Contact

ABB B.V.
Bruntcliffe Lane
Morley, Leeds
W.Yorkshire LS27

 

9LL, 

United Kingdom
Tel: +44 (0) 113 281 0600

E-Mail: [email protected]

new.abb.com

Summary of Contents for PrimEvo TW220E

Page 1: ...intenance Technical specifications Power Supply 220 240VAC 50 60 Hz Power Consumption Max 6 5W LED SMD 2W Operation Maintained or Non maintained Function Manual test Discharge Duration 3 Hours Charge Time 24 Hours Battery Ni M 3 6V 1 5Ah 2pcs Protection Grade IP20 Protection Class II Emergency lumens output 220 lm NI Mh 3 6V 1 8Ah 2pcs ...

Page 2: ...his product 3 The luminaire is suitable for indoor use only 4 Before installing the luminaire the supply must be isolated 5 The luminaire must be replaced when it will not achieve their rated duration MOUNTING INSTRUCTIONS 1 Use flat blade screwdriver insert the two slots and pry off front cover from back plate 2 Disconnect AC male and female connector 3 Knock out center and appropriate mounting s...

Page 3: ... leave Jump cable connected For switchable Maintained Operational Connect L N and remove Jump cable Connect switch live to terminal indicated Non maintained Operational Connect L N and remove Jump cable NEUTRAL SWITCH LIVE PERMANENT LIVE JUMP CABLE N L SL PHOTOMETRIC SPACING INFORMATION Beam angle C 22 C90 120 Lighting distribution 90 0 60 30 90 60 30 Spacing distance 2m 1m Central Axis Spacing Ta...

Page 4: ...rmation in this document We reserve all rights in this document and in the subject matter and illustrations contained therein Any reproduction disclosure to third parties or utilisation of its contents in whole or in parts is forbidden without prior written consent of ABB AG Copyright 2017 ABB All rights reserved RPM 311 REV E 8 11 2017 Contact ABB B V Bruntcliffe Lane Morley Leeds W Yorkshire LS2...

Reviews: