Assembly Instructions / Power2 850-M
4 Installing the low-pressure stage /
© Copyright 2019 ABB. All rights reserved.
HZTL455311P0010_EN
Revision A
March 2019
4
Installing the low-pressure stage
Fixing elements and installation forces
The fixing screws for fastening the low-pressure stage are not included in the ABB Turbo
Systems scope of delivery and must be designed by the enginebuilder in accordance with
the following details.
Fig. 4: Fixing elements
Subject
Requirements
Fixing elements
Plug bolt or screw with washer
Washers under the screw head
or nut
Use hardened washers,
thickness
≥
15% of the nominal thread diameter
Table 7: Fixing elements
The required installation pre-tensioning force for the fixing elements of the low-pressure
stage are defined in table
(see Table 8: Fixing element requirements
. An appropriate
tightening method must be chosen for assembly.
Subject
Power2
850 LP
Thread size
M20
Quantity
8
Low-pressure stage foot – clamping length a
70 mm
Clearance in bracket – diameter G
n/a
Clearance in bracket – depth I
0 mm
Minimum screw-in depth b
30 mm
Installation pre-tensioning force F
M
190 kN
Tightening torque M
A
(in accordance with VDI 2230, M20, 10.9,
μ
G
=0.12)
600 Nm
Table 8: Fixing element requirements
For the case of the torque-controlled tightening method, an appropriate tightening torque
is defined in table
(see Table 8: Fixing element requirements
in accordance with
VDI2230.