![ABB Power2 550-M Operation Manual Download Page 79](http://html.mh-extra.com/html/abb/power2-550-m/power2-550-m_operation-manual_2838020079.webp)
Operation Manual / Power2 550-M / High-pressure stage
9 Disassembly and assembly / 9.4 Removing the gas outlet casing
© Copyright 2022 ABB. All rights reserved.
HZTL4058_EN
Rev.F
March 2022
9.4
Removing the gas outlet casing
u
Mark the casing position for assembly.
Fig. 31: Removing the gas outlet casing
1. Loop the lifting gear around the gas outlet casing (61001).
2. Loosen screw (61003) and remove with Verbus Ripp® washer (61004).
3. Remove the support (61300).
4. Loosen nuts (51009) and remove with Verbus Ripp® washers (51004) and lugs (51015).
5. Remove the gas outlet casing (61001).
6. Remove the metal C-rings (57004) and (51026).
u
Measuring radial clearances N and R
Page
79
/
119