ABB Navigator 550 Spares Replacement Procedures Download Page 4

For more information please contact:

INF13/114–EN

05.2013

3.5 Replacing the Modbus cable assembly

Modbus cable part numbers:

AW503 090 / 1.5 m (4.9 ft.)

AW503 091 / 5 m (16.4 ft.)

AW503 092 / 10 m (32.8 ft.)

AW503 093 / 20 m (65.6 ft.)

Referring to Section 3.2, page 2:

1. Remove the wet-section PCB cover.

Referring to Fig. 3.7:

2. Loosen cable gland

A

at the wet-section PCB housing

B

and disconnect the Modbus cable

D

from the terminal block

connections

C

marked black, red, screen, green and white.

3. Withdraw the Modbus cable

D

from the PCB housing and

main case assembly and discard.

4. Feed the replacement Modbus cable into the main case via

the guide channel

E

at the top, feed through the gland and

remake connections to the black, red, screen, green and

white PCB wet-section terminals and at the transmitter.

5. Refit the PCB cover by reversing the removal procedure.

Fig. 3.7 Replacing the Modbus cable assembly

B   R 

 SCR

G W

Note

We reserve the right to make technical changes or modify the contents of this

document without prior notice. With regard to purchase orders, the agreed particulars

shall prevail. ABB does not accept any responsibility whatsoever for potential errors or

possible lack of information in this document.

We reserve all rights in this document and in the subject matter and illustrations

contained therein. Any reproduction, disclosure to third parties or utilization of its

contents in whole or in parts – is forbidden without prior written consent of ABB.

Copyright© 2013 ABB

All rights reserved

ABB Limited

Process Automation

Oldends Lane

Stonehouse

Gloucestershire GL10 3TA

UK

Tel:+44 1453 826 661

Fax:+44 1453 829 671

ABB Inc.

Process Automation

125 E. County Line Road

Warminster

PA 18974

USA

Tel:+1 215 674 6000

Fax:+1 215 674 7183

www.abb.com

Reviews: