ABB Navigator 550 Spares Replacement Procedures Download Page 2

3 Replacement procedures

2

INF13/114–EN

| Navigator 550 | Hydrazine wet-section | Spares replacement procedures

3.1 Replacing the PCB housing seals, PCB cover and PCB

Part numbers:

PCB housing seals: AW503 051

PCB cover: AW503 052

PCB: AW503 050

Referring to Fig. 3.2:

1. Remove and retain the 4 PCB cover fixing screws and

washers

A

and remove the PCB cover

B

.

2. If replacing PCB housing seals, remove and discard housing

seal

C

.

3. Disconnect all cables from the PCB

D

, loosen all cable

glands and remove cables.

4. Remove and retain the 4 PCB housing fixing screws and

washers

E

and remove the PCB housing

F

.

5. If replacing PCB housing seals, lift PCB housing seal

G

out

of the groove and discard.

6. Remove and retain the 2 PCB fixing screws and washers

H

and remove the PCB

D

. If replacing PCB housing seals, fit

the new (large) PCB housing seal

G

in the groove (a small

amount of silicone sealant or grease can be used to help
retain the seal in place).

7. Fit the new PCB to the rear of the main case using the 2 PCB

retaining screws and washers

H

.

8. Refit the PCB housing

E

using the 4 PCB housing fixing

screws and washers

D

.

Referring to Fig. 3.3 and Table 3.1 for terminal connection details:

9. Make cable connections at the new PCB.

Referring to Fig. 3.2:

10. If replacing PCB housing seals, fit the new (small) PCB

housing seal

C

between the PCB cover

B

and PCB

housing

F

(a small amount of silicone sealant or grease can

be used to help retain the seal in place).

11. Refit the PCB cover

B

using the 4 PCB cover fixing screws

and washers

A

, ensuring PCB housing seal

C

is located

correctly in its groove.

3.2 Replacing the flowmeter assembly and flowmeter cable

Part numbers:

Flowmeter: AW503 068

Flowmeter cable: AW503 086

Referring to Fig. 3.4:

1. Disconnect the flowmeter cable

A

from the flowmeter

B

.

remove the sample inlet tubing

C

from the flowmeter inlet

spigot

D

. If replacing cable(s), refer to Section 3.1 for cable

disconnection details and remove / discard the cable.

2. Disconnect the flowmeter

B

from the QD connector

E

above the flowmeter by pressing the ring and pulling the

flowmeter away.

3. Fit the new flowmeter / cable in the reverse order of removal.

Fig. 3.2 Replacing the PCB housing seals, PCB cover and PCB

Fig. 3.3 Wet section PCB cable entries

B   R 

 Scr

G W

1  3  5  7  9  1 1  13  15 17 19 21 23 25 27 29 31 33 3

  2  4  6  8  10 12 14 16  18 20 22 24 26 28 30 32 34 36

2

3

4

5

1

Additional

'daisy-chain'

cable

connections

Entry

Cable

Color

Terminal

Description

1

Serial (Modbus) – refer to
Operating Instructions

(OI/AHM550-EN)

for

multiple wet-section
setup.

Red
Black
Green
White
Screen

R
B
G
W
SCR

24 V
0 V
Data +ve
Data –ve
Screen

2

Sensor block

Blue
Red
Black
Yellow

31
32

33
35

+ve
–ve
Pt1000
Pt1000

3

Pressure switch

Red
Black

25
26

N/A
N/A

4

Calibration
valve

Red
Black

9
10

+ve
–ve

5

Flowmeter (if fitted)

Red
Brown
Black

13
15
17

+ve
GND
–ve

Table 3.1 Wet-section cable terminal connections

Fig. 3.4 Replacing the flowmeter assembly and flowmeter cable

Reviews: