4 Repair
4.3.2. Replacement of Serial Measurement Board Unit
119
3HAC030005-001 Revision: -
©
Copyri
ght 200
6 ABB
.
All ri
ghts res
erved.
Required equipment and Refereces
Removal SMB Unit
NOTE!
This product contains certain materials considered hazardous. This product must be disposed
of in accordance with the current legislation of the country in which the robot and control unit
is installed.
Refitting SMB Unit
NOTE!
Check the new battery using a Voltameter, it should read 12V.
Equipment
Spare part no.
Note
Standard Tools
Serial Measurement Unit
Spare Parts, SMB Unit
on page 213
Base Cover Gasket
Spare parts in the base
on page 214
(If damaged)
Plastic washer
Spare parts in the base
on page 214
(If damaged)
Refereces
Circuit Diagram 3HAC028647-009
Updating revolution counters on page 182
.
Replacement of base cover gasket on page 116
Action
Note
1. Remove the base cover.
Described in section
Replacement of base cover
gasket on page 116
2. Remove the three(3) Flange screws holding the
bracket for the SMB Unit.
Use Standard Tools
3. Disconnect all the cables from the SMB Unit.
4. Remove the SMB Unit.
Action
Note
1. Refit the new SMB Unit.
2. Connect all cables.
As described in Circuit Diagram
3HAC028647-009
3. Refit the bracket using the three(3) Flange screws.
Tightening Torque 4 Nm
4. Refit the base cover.
Described in section
Replacement of base cover
gasket on page 116
5. Update the revolution counters
revolution counters on page 182
Continued
Summary of Contents for IRB 360/3
Page 1: ...Product manual Parallel robot IRB 360 IRB 360 3 IRB 360 1 800 M2004 ...
Page 2: ......
Page 8: ...Table of Contents 6 3HAC030005 001 Revision Copyright 2008 ABB All rights reserved ...
Page 246: ...Index 232 3HAC030005 001 Revision Copyright 2008 ABB All rights reserved ...
Page 247: ......