![ABB Integritas 24V-C Quick Start Manual Download Page 18](http://html1.mh-extra.com/html/abb/integritas-24v-c/integritas-24v-c_quick-start-manual_4117254018.webp)
QUICK START GUIDE
Page 18
© 2021 ABB. All rights reserved.
Specifications and Application
•
External Surge Protection Device (SPD) is required on all AC inputs.
•
Equipment Safety is Approved in UL1449/IEC 60664
-
1 Installation Category II environments up to 50°C ambient.For
rectifier input voltages above 266V
AC
, the maximum output current and power are derated by 2.8% per °C for operating
ambient above 40°C.
•
Equipment and subassembly ports:
1.
Are suitable for connections to intra
-
building or unexposed wiring or cabling.
2.
Can be connected to shielded intra
-
building cabling grounded at both ends.
•
Grounding / Bonding Network –
Connect to an Isolated Ground Plane (Isolated Bonding Network) or an Integrated
Ground Plane (Mesh
-
Bonding Network or Common Bonding Network).
•
Installation Environment –
Install where NEC applies.
Reference Documents
These documents are available at
Document
Title
CC88815431
Pulsar Plus Controller Family Product Manual
8600228897P
LM2500 125V Floor Mount Charger –
Quick Start Guide
“
Charger A
”
8600228917P
LM2500 125V Floor Mount Charger –
Quick Start Guide
“
Charger B
”
8600228918P
LM2500 24V Floor Mount Charger –
Quick Start Guide
“
Control, Fire & Gas
”