![ABB i-bus EIB RC/A 8.1 Mounting And Operation Instructions Download Page 17](http://html1.mh-extra.com/html/abb/i-bus-eib-rc-a-8-1/i-bus-eib-rc-a-8-1_mounting-and-operation-instructions_3838774017.webp)
Prior to switching on the supply of power to the Room-Controller Basis
Device, all plug-in screw type terminals must be correctly inserted.
Important notes:
Installation and commissioning of the device may only be carried out by
trained electricians. The Room-Controller Basis Device must be electrically
isolated during installation work, particularly
- During installation or removal from the Room-Controller Basis Device! - Prior
to pulling off the plug-in screw type terminals!
- During the connection of the outputs!
The relevant standards, directives, regulations and instructions must be ob-
served when planning and implementing the electrical installation.
- Protect the device against moisture, dirt and damage during transport,
storage and operation!
- Do not operate the device outside the specified technical data!
- The device may only be operated in the Room-Controller Basis Device!
- Only operate the device in the permissible temperature range!
EN
Danger
2
See figures