HVC 450 kW E-Bus Charger Installation Guide
Revision: 1.2
COMPANY CONFIDENTIAL
Date released: 16-08-2018
Page
40
of
128
4.2.4. Workflow with custom foundation (footprint)
1. Drill and tap holes in the floor at the indicated positions (A). The holes must be suitable
for bolt size M16.
2. Make rectangular holes on the indicated positions (B) and (C). For detail drawings bottom
view of Power Cabinet see Appendix A
Dimensions Power Cabinet
.
3. Make sure that the AC power cable and other cables comes out of the floor within the
marked area (B).
4. Make sure that the DC power cables come out of the floor within the marked areas (C).
5. For the AC and DC power cable, make sure that a cable length of 3.28 ft is available
above the floor for internal routing in the cabinet.
6. For the other cables, make sure that a cable length of 9.84 ft is available above the floor
for internal routing in the cabinet.
NOTICE
This extra cable length is required to connect the cables with the
connectors in the Power Cabinet without problems.
NOTICE
To prevent dust from entering the tapped holes, it is recommended that
you cover them until you are ready to do the placement.