5.3.2
Wet cleaning using external water-pressure vessel
(XC3)
Operating state prerequisites for wet cleaning XC3
NOTICE
To be able to carry out a satisfactory cleaning process which has been
tested and is recommended by ABB Turbocharging, the following pre-
requisites must be fulfilled:
u
Engine load 50 … 85%
u
Start of cleaning cycle in accordance with following description for
wet cleaning operation with XC3.
Operating procedure for compressor wet cleaning with XC3
Operating the water pres-
sure vessel
u
The operating state prerequisites for compressor cleaning with XC3
must be fulfilled.
u
Remove sealing plug (X).
u
Fill vessel with required volume of clean water (see
table Cleaning
parameters
).
u
Screw in sealing plug (X).
Page