Operation Manual / A150-M56/66/57/67 - A155-M..
Figures
© Copyright 2021 ABB. All rights reserved.
HZTL4032_EN
Revision Q
January 2021
Figures
Fig. 1: Serial number (01) on the rating plate ........... 4
Fig. 2: Layout and function of the turbocharger...... 6
Fig. 3: Compressor wheel cooling ................................ 7
nhibitor (VCI)................... 10
Fig. 5: Package with hygrometer................................ 11
Fig. 6: Warning plate locations ................................... 16
Fig. 7: Rating plate ........................................................ 17
Fig. 8: Locations of the rating plates ........................ 18
Fig. 9: Attachment of loads on the crane hook ...... 20
Fig. 10: Attachment angle........................................... 20
Fig. 11: Suspension of complete turbocharger unit ....
29
Fig. 12: Turbine cleaning nozzle ................................. 30
Fig. 13: Removing the turbocharger ......................... 30
Fig. 14: Loosening the clamping nut ......................... 31
Fig. 15: Turbocharger centre of gravity .................... 32
Fig. 16: Inserting the gasket........................................ 33
Fig. 17: Fitting the turbocharger 1............................. 34
Fig. 18: Fitting the turbocharger 2 ............................ 35
Fig. 20: Tightening pressure screws ......................... 37
Fig. 21: Connecting the speed sensor ...................... 38
Fig. 23: Attaching the support ................................... 38
Fig. 24: Oil orifice.......................................................... 40
Fig. 26: Replacing the speed sensor ......................... 49
Fig. 27: Noise insulation, bellows ............................... 51
Fig. 28: Carrying out wet cleaning of compressor.. 61
Fig. 29: Turbine cleaning devices .............................. 64
Fig. 30: Carrying out wet cleaning of turbines ....... 65
Fig. 31: Cleaning the filter silencer ............................ 67
Fig. 32: Compressor-end, non-rotating parts.......... 69
Fig. 33: Turbine end, non-rotating parts.................... 71
Fig. 34: Soaking the turbine end................................. 73
Fig. 35: Disassembling the absorption element...... 76
Fig. 36: Installing the absorption element................ 77
Fig. 37: Swivel lifting eyes ............................................ 86
Fig. 38: Press-off screws .............................................. 87
Fig. 39: Dismantling screw........................................... 87
Fig. 41: Cartridge concept............................................ 90
Fig. 42: Optional spanner holder ................................ 91
Fig. 43: Weights of assemblies ................................... 92
Fig. 44: Overview of tightening torques ................... 93
Fig. 45: Tightening torques for insulation................ 94
Fig. 46: Removing the air inlets .................................. 95
Fig. 47: Removing the uncoupled filter silencer ...... 96
Fig. 48: Remove gas outlet casing without support ...
97
Fig. 49: Removing gas outlet casing with support 1 ...
98
Fig. 50: Removing gas outlet casing with support 1 ...
99
Fig. 51: Dismantling the gas outlet flange.............. 101
Fig. 52: Removing the gas outlet flange.................. 102
Fig. 53: Turbine cleaning nozzle................................ 103
Fig. 54: Remove insulation......................................... 103
Fig. 57: Removing the compressor casing.............. 105
Fig. 58: Dismantling the diffuser and the wall insert ..
106
Fig. 59: Removing cartridge group 1........................ 107
Fig. 60: Removing cartridge group 2 ....................... 108
Page
190
/
194
Page
190
/
194
Summary of Contents for HT605172
Page 2: ......