Inspection procedures include preventative visual controls, monitoring and measuring work
before and during commissioning. Inspection procedures enable changes to the turbocharger
to be detected. Engine damage can be prevented.
3.2.2
Checks before commissioning
Air filter mat (if present)
Check for damage and contamination.
Lubricating system
CAUTION
Contaminated oil
Serious damage to engine or property can be caused by dirt and solid mate-
rial particles in the oil.
At initial commissioning and after all service work, the complete lubricating
system must be thoroughly flushed with warm oil.
Use special running-in filters when running in the engine and after all ser-
vice work on the lubricating system.
Check that the oil filter is clean before commissioning.
Check the oil pressure in the oil supply pipes.
3.2.3
Checks after commissioning (engine in idle mode)
Lubricating system
Check the oil pressure in the oil supply pipes.
Check oil inlet temperature.
The admissible values are specified in section Oil supply.
Gas, air and oil pipes
After starting the engine, check all gas, air and oil pipes for leaks.