4.
Installation
General
The connection of the enabling device to the machine must only be carried out by specialist personnel who
are qualified in this field, in accordance with the regulations for AS-i networks, the applicable guidelines and
standards, as well as the data sheet enclosed with the product.
Attention should be paid to existing or preset addressing (delivery state) of the enabling device. If
necessary, it should be adjusted before integrating it into the AS-i network!
The connection to the AS-i network uses a two-core connection cable.
A suitable contact according to the connection methods to the AS-i network should be
established
It is recommended to follow the procedure shown in the picture on the right, using an
M12 connector.
Normally, the M12 connector should be attached to Pin1 (AS-i +) and Pin 3 (AS-i -).
Please ensure
in accordance to the national electrical codes, the separate laying of cable that serve the
power supply (control and main circuits) and the cable that serve to transmit control
signals!
The connection cable of this device must be laid in the area for control signals!
All functions, especially those relevant to safety, shall be checked and tested to ensure
they are working properly before commissioning takes place.
If this is not done, the possible property damage or personal injury can occur!
Installing the holder
At mounting the specific holder
“HD5
-M-
xxx”
please ensure that the enabling device hang up completely in
the holder.
The Position should selected in view of ergonomic and safety relevant aspects.
More Information in Section 10 “Accessories”