![ABB GSA-OO Technical Manual Download Page 12](http://html.mh-extra.com/html/abb/gsa-oo/gsa-oo_technical-manual_4050012.webp)
12
TR A N S FOR M E R BUS H I NG S T Y PE G SA - OO
T EC H N I C A L G U I D E
—
Conductor loading
Overloading of bushings
If the conductor for the bushing is selected for 120 % of the
rated current of the transformer, the bushing is considered
to be able to withstand the overload conditions stated in
IEC 60076-7 without further clarifications or tests,
according to IEC 60137.
Short-time current
The rated thermal short-time current (I
th
) is calculated
according to IEC 60137.
Table 7.
Conductor
Rated
current
A
Area
mm
2
Short-time current (I
th
)
kA, rms
Dynamic
current (I
d
)
kA, peak
1 s
2 s
Solid rod
Ø 58 mm
2500.. 1600 2642
100
100
315
Stranded
draw-lead
2000.. 1250 1200
89
63
157
The GSA-OO bushings is heat run tested with solid
conductors and 1200 mm
2
stranded cable. The test currents
together with calculated values for different stranded
cables are given in the table below:
Table 6.
Bushing
Conductor
Tested permissible
current
Calculated
permissible
current
A
IEC
A
IEEE
A
LF 135 073
Solid rod ø 58 mm
2500
2500
Stranded cable
1200 mm
2
2000
2000
900 mm
2
1500
450 mm
2
1000
150 mm
2
500
LF 135 123
Solid rod ø 58 mm
2000
2000
Stranded cable
1200 mm
2
1600
1600
900 mm
2
1200
450 mm
2
850
150 mm
2
450
LF 135 145
Solid rod ø 58 mm
2000
2000
Stranded cable
1200 mm
2
1600
1600
900 mm
2
1200
450 mm
2
850
150 mm
2
450
LF 135 170
Solid rod ø 58 mm
2000
2000
Stranded cable
1200 mm
2
1600
1600
900 mm
2
1200
450 mm
2
850
150 mm
2
450
LF 135 245
Solid rod ø 58 mm
1600
1600
Stranded cable
1200 mm
2
1250
1250
900 mm
2
950
450 mm
2
650
150 mm
2
350