Installation and commissioning guide
2750 515-1 EN, REV. 14, 2020-06-26
63
3.
Find leaking gas with gas detector (sniffer) near
the gasket.
G005046
End of instruction
5.2.4 Measurement of capacitance and dissipation factor
Overview
After installation of the bushing, it is recommended to measure the capacitance values for future reference,
such as repairs, service etc. This can be done on an installed bushing because it has an insulated test tap.
Refer to 2750 515-142, “Bushing diagnostics and conditioning”.
•
C
1
is the capacitance between the test tap and the outer terminal.
•
C
2
is the capacitance between the test tap and ground.
Nominal capacitance
The capacitance (C
2
) depends on the transformer, and it is not possible to give a nominal value that is valid
for all service conditions. Thus, it is important to measure and record the capacitance (C
2
) for future
reference, such as repairs, service etc.
Type
Space for CT = 305 mm
Space for CT = 605 mm
C
1
C
2
*
C
1
C
2
*
GOE 250-210
432
290
571
480
GOE 380-300
432
290
571
480
GOE 650-500
389
300
490
480
GOE 950-650
370
658
454
790
GOE 1050-750
373
390
431
590
GOE 1175-850
391
480
465
840
GOE 1300-1050
515
640
550
896
GOE 1425-1150
515
640
550
896
GOE 1550-1175
463
700
460
700
GOE 1675-1300
463
700
460
700
GOE 1800-1360
463
700
460
700
GOE 2550-1600
550
4610
560
4820
GOE 2550-1675
585
5000
669
5700