background image

2

 

GE is a registered trademark used under license from General Electric company

 

 

 

DEH41

22

9 R

02

 06 

20

 

 

ABB Inc.

 

305 Gregson Drive Cary, NC 27511

 

 

8. Remove the Knockouts for All Main and Branch Circuits 

First  drive  the  center  knockout  inward.  The  outer  rings  should 

then be alternately pried up or driven in one at a time. 

 

9. Pull Incoming Service and Branch Circuit Wiring into the Box 

Good practice includes forming drip loops where applicable. 
 

10. Replace the Interior 

Drive in the mounting screws loosened in step 4. 
 

11. Wire Main, Neutral, and Equipment Ground 

Refer  to  the  rating  label  inside  the  equipment  for  the  proper 

tightening torques. Wire the neutral and equipment grounds only 

in the directions indicated by the arrows in the figure. For service 

entrance only, the bond screw is provided. 

 

12. Optional Wiring of Neutral and Ground 

For panelboards rated at 150 A or less, the neutral crossbar may 

be  removed  to  provide  optional  neutral  and  ground  wiring  as 

follows: 

Left  side

 

  Insulated  neutral  or  ground  without  bonding  strap. 

Uninsulated neutral or ground with bonding strap provided. 

Right  side

 

  Insulated  neutral  or  ground  only.  No  bonding 

provision provided. 

NOTE:

 

If the load center is main breaker type and is not intended 

for service entrance use, remove the bonding strap

13. Reinstall the Service Entrance Barrier 

If necessary, reinstall the service entrance barrier removed in step 

3. Secure the barrier with the two mounting screws. 

 

 

 

 

14. Wire Branch Circuits 

Individually  wire  each  branch  circuit  into  a  circuit  breaker,  then 

plug the breaker into the interior. Refer to the label on the breaker 

for the proper tightening torque. Use GE circuit breakers only. 

 

15. Remove Shield Knockouts 

Place a screwdriver as shown and tap with a hammer. 

 

16. Important 

Retighten  all  electrical  connections  before  energizing  the  load 

center. 

 

17. Install the Shield 

a.

 

Rotate the cover latch clockwise. 

b.

 

Install the shield and tighten the shield-fastening screw. 

 

18. Identify Circuits 

Use  the  labels  provided  to  identify  the  circuits  for  the  user’s 

convenience. 

 

19. Install the Door 

Drive in the hinge screws. 

NOTE:

 

Retighten all electrical connections before energizing the 

load center. 

Attention 

 Procedure for Aluminum Terminations 

  1.

 

Strip the insulation, being careful to not nick the wire. 

 

2.

 

Clean the wire strands with a wire brush. 

 

3.

 

Thoroughly  coat  the  stripped  conductor  with  a  suitable 

antioxidant compound, such as ALNOX or PENETROX A13. 

 

4.

 

Insert the conductor and tighten the connector screw to the 

indicated torque, as indicated on the rating label. 

 

 

 

 

 

Bond 

Strap 

Crossbar 

Insulated 

Ground or 

Neutral 

Uninsulated 

Ground or 

Neutral 

Equipment 

Ground 

These instructions do not cover all details or variations in 

equipment, nor do they provide for every possible 

contingency that may be met in connection with installation, 

operation, or maintenance. Should further information be 

desired, or should particular problems arise that are not 

covered sufficiently for the purchaser’s purposes, the matter 

should be referred to ABB Company. 

 

Summary of Contents for GE PowerMark Plus DEH40229

Page 1: ...otect the finish Save the screws for reuse 2 Remove the Shield a Loosen the fastening screw the screw will be retained in the shield b Insert a screwdriver under the loop then lift the shield up and out c Slip the shield back into the carton to protect the finish 3 Remove the Service Entrance Barrier Main Breaker only Back out and save the mounting screw securing the service entrance barrier over ...

Page 2: ...rier with the two mounting screws 14 Wire Branch Circuits Individually wire each branch circuit into a circuit breaker then plug the breaker into the interior Refer to the label on the breaker for the proper tightening torque Use GE circuit breakers only 15 Remove Shield Knockouts Place a screwdriver as shown and tap with a hammer 16 Important Retighten all electrical connections before energizing...

Page 3: ...garde a Dévisser les vis qui y sont fixées Les vis seront retenues par le garde b Insérer un tournevis sous la boucle soulever le garde et le retirer c Glisser le garde dans le carton pour en protéger le fini 3 Retirer la barrière de l entrée de service Disjoncteur principal seulement Dévisser et conserver le vis de montage retenant la barrière de l entrée de service par dessus les connexions du d...

Page 4: ... l étape 2 Fixer la barrière avec le vis de montage 14 Câbler les circuits de dérivation Câbler individuellement chaque circuit de dérivation à un disjoncteur puis le brancher à l intérieur Vous référer à l étiquette sur le disjoncteur pour un couple de serrage approprié N utiliser que des disjoncteurs GE 15 Enlever les débouchures du couvercle Placer un tournevis tel que montré et frapper avec un...

Reviews: