I N S T A L L A T I O N P R O C E D U R E S
74
FOX615
Installation
Cable clamp removal
Proceed as follows:
1. Tear the spring bracket outward to the right (11) until it unlocks from the
notch (14) on the earthing bar.
To unlock the notch from the tab, proceed with a
screwdriver No. 2
(standard slot head) as shown in
(left cable clamp shown for
better visibility!).
−
Insert the blade of a screwdriver No. 2 into the cut-out (31) of the
spring bracket.
−
Rotate (R) the screwdriver towards the spring bracket while applying
the blade of the screwdriver to the edge (32) of the spring bracket.
−
Stop rotating when the notch unlocks (U) from its tab on the earthing
bar.
−
While with the screwdriver keeping the notch unlocked from the tab,
rotate (C) the spring bracket outwards.
2. Remove the right end of the clamp from the earthing bar by rotating it
outward (12).
3. Unhook the left end of the clamp from the earthing bar (13) and remove
(A) the clamp completely.
4. Follow the same steps mirrored to the left to remove the left side clamp
from its earthing bar.
End of instruction
Figure 48: Detail of unlocking a cable clamp with a screwdriver (appli-
cation with left clamp shown)
Please note:
For re-installation of the cable clamp the signal cables must be fixed on the
cable tray and connected to the interfaces of the units!
To install the right side cable clamp to its earthing bar proceed as follows:
31
R
32
R
C
U
No. 2
Summary of Contents for FOX615
Page 1: ...ABB Power Systems FOX615 Installation User Manual ...
Page 6: ...4 FOX615 Installation ...
Page 10: ...8 FOX615 Installation ...
Page 96: ...A N N E X 94 FOX615 Installation ...
Page 97: ......