20
Start-up and operation
Starting and stopping the inverter
Inverter control with parameter
To enable inverter operation, set parameter 189.01
Inverter operation value
to
Enable
. You
can edit the parameter value directly in the parameter group 189
Inverter Control
with the
control panel or with a computer through USB or SCADA.
During the first start-up FIMER recommends that you limit the output using the parameter
130.75, let the inverter run for a few minutes at limited power, and check that no loud
noises or vibrations are present. Gradually increase the power output limit up to the
desired power.