Commissioning
84 2CDC512090D0202 | QA/S x.yy.1
No.
Column header
Description
Metering structure
Used to navigate and select a consumer or node. The metering structure must first be
configured in Management > Metering Structure.
Click the
icon to show or hide the metering structure.
Analysis functions
Menu for selecting the required analysis function
Media
Displays the media available in the system. Depending on the M-Bus/Modbus devices
connected, the media electricity, water, gas and heat are displayed here.
The M-Bus/Modbus devices must be assigned to a metering structure for this purpose.
If M-Bus/Modbus devices have been assigned to consumer groups (e.g. lighting, electrical
sockets, air conditioning, etc.), they can be opened using the
sub-menu.
First axis settings
Used to select the required unit (e.g. costs, consumption, load profile, etc.) and to display it
on the chart (e.g. column chart, line chart, load profile, etc.)
Second axis
settings
Used to select the required unit (e.g. costs, consumption, etc.) and to display it on the chart
(e.g. column chart, line chart, etc.)
Actions
Used to select further data processing options (e.g. Save as image, Export to .xlsx, csv,
Save as favorite, Print chart)
Chart area
Used to display the data graphically. Click and drag or click a value on the chart to zoom.
Slider
Used to limit and move the required period.
Calendar function
Used to enter the required period (from/to).
Presets
Used to select and display current day, week, month, year, all. Presets are shown
dynamically, depending on the measuring period:
Day: always visible; Week: after 2 days: Month: after 7 days: Year: after 6 months:
All: Always visible
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
Summary of Contents for EQmatic
Page 1: ... PRODUCT MANUAL EQmatic Energy Analyzer M Bus Energy Analyzer Modbus ...
Page 9: ......
Page 95: ......
Page 105: ......