
E M A X LI N K 2 A B B R E V I ATE D
LV S W I TC H G E A R A P P L I C AT I O N G U I D E
9
—
Assembly construction
2. Busbar compartment: The compartment where
main and distribution busbar systems are
installed.
3. Cable compartment: Location where power
connections are made to the rear of the device.
Emax Link 2 standard compartments
Emax Link 2 standard compartments
Busbar compartments
The main horizontal busbar is installed in the
busbar compartment located at the middle of the
section. The main horizontal bus may be supplied in
various configurations depending on the current
rating.
Horizontal busbars
Bus phases
The horizontal busbar is located at the bottom of
each section. The phase arrangement of 3-phase
horizontal busbar and vertical busbars is A, B, C
from top to bottom, or left to right, as viewed from
the front.
The busbar systems are installed in the lower level
busbar compartment. The tie busing will be
installed at the upper level.
Location 1
Location 2
Location 3
Location 4
Cable compartment
Bus compartment
Device compartment
Location AB
Location CD
Cable compartment
Bus bar compartment
Device compartment
Segregation wall to
device compartment
Main Busbar
Breaker segregation
Segregation wall to
cable compartment