Installation for AKD6 AKR75/100
Installation process for AKD6 AKR75/100 remains same as detailed in Pages 26,27 and 28.
However Below are the main differences:
1. Removal of rail latch levers is not applicable for AKD6 AKR75/100 compartment.
2. Breaker “disconnect” position of the legacy breaker will be same as corresponding
disconnect position for the retrofill breaker. (unlike the “test” position for small frames)
3. Use the Legacy Breaker Racking Mechanism in the AKD6 switchgear for racking in the
Emax2 AKR75/100 Retrofill breaker from disconnect postion to connect position.
Follow the indications on the drum indicator on the legacy switch gear.
4. The Installation sequence for AKD6 Emax2 AKR75/100 Retrofill Breaker into AKD-6 Co-
-mpartment is explained through Figs. 26a-g.
Figure 26
INSTALLATION SEQUENCE FOR AKD-6 EMAX2 AKR75/100 RETROFILL BREAKER INTO AKD-6 COMPARTMENT
a
b
c
d
f
g
e
AKD6 AKR75/100
Compartment
Loading The
Breaker
Push The
Breaker In
On Loading Rails
Racking In The
Breaker Using
Racking Handle
Breaker Racked In
To Connected
Position
AKD6 AKR75/100
DOOR CLOSED
AKD6 AKR75/100
DOOR CLOSED
KIRK LOCK
INSTALLED
©2022 Emax 2 Retrofill Circuit Breakers 800A-4000A 29