IL 44-751-1
Instruction Leaflet
Page 14 November, 2001
Figure 18. Bolt for shield not touching the gear.
Figure 19. Assembly of outer and inner shielding on DTW.
12. After the drying and impregnation process of the core and coil make sure the glass fiber nuts
holding the Micarta boards to the Super structure are tightened by once again.
13. Before the core and coil is mounted into the tank the Main Drive shaft should be positioned at
the correct height so that it is aligned with the hole in the mounting boss. A length of cotton
tape (or similar material) can be used as a sling to assist in this alignment process. Once the
drive shaft is properly aligned, tie the cotton tape sling to the superstructure to hold the shaft
in place temporarily. See figure 20.