![ABB Aztec 600 User Manual Download Page 71](http://html.mh-extra.com/html/abb/aztec-600/aztec-600_user-manual_4347071.webp)
Aztec 600 aluminium, ammonia, color, iron, manganese, phosphate
Single- and multi-stream colorimetric analyzers
13 Maintenance
68
IM/AZT6CR–EN Rev. J
2. Referring to Fig. 13.5:
a. Note the routing of the waste tube (recorded in
Section 13.3.4, step 4a).
b. Remove the tube from clip
C
and discard.
c. Route the new waste tube as noted in step a and
connect it to the waste valve connector
D
on the
valve manifold.
3. Referring to Fig. 13.6:
a. Disconnect the interconnecting tube (recorded in
Section 13.3.4, step 4a) from the connector
E
at
the base of the measurement cell assembly and
discard.
b. Fit the new interconnecting tube to the valve
manifold center connection
F
.
Do not connect the tube to connector
E
at this
stage.
Caution.
Ensure the correct tube is fitted
– AW630 371 (Tygon 3603)
Fig. 13.5 Replacing the Waste Tube
D
C
Caution.
Ensure the correct tube is fitted:
– AW630 370 (Tygon 3603)
Fig. 13.6 Replacing Interconnecting Tube
E
F