ABB AutoLink Instruction Book Download Page 4

TEHI95094 

– Rev. 2 

 

 

 

 

 

 

 

 

         4/ 12 

 

1.  Introduction 

This  document  contains  the  required  information  to  install  medium  voltage  AutoLink 
Sectionalizer and put it into service. 

For a correct use of the product, please read it carefully. 

Like every apparatus we manufacture, AutoLink is designed for specific applications. 

Use only original spare parts. 

For further information, please read the technical catalogue. 

All 

installation,  putting  into 

service,  commissioning  and 

maintenance  operations  must  be  carried  out  by  suitably  qualified 
personnel with in-depth knowledge of the apparatus.

 

2.  Packing and Transportation 

The AutoLink Sectionalizer is shipped in cardboard package, in armed position. 

3.  Checking on Reception 

Before  carrying  out  any  operation,  always  make  sure  that  the 
operating mechanism springs are charged and that the apparatus is in 
armed  position.  When  performing  a  reception  test,  it  is  required  to 
wait 5 minutes with the device de-energized after a tripping operation, 
to reset it. 

On  reception,  check  the  state  of  the  apparatus,  integrity  of  the  packing  and  nameplate 
information is the same requested on the purchase order specifications. 

Make sure that all materials described in the shipping note are included in the supply. 

If  any  damage  or  irregularity  is  seen  in  the  supplied  product  after  unboxing,  notify  ABB 
(directly or through the agent or distributor) as soon as possible within five days of receipt. 

The apparatus is only supplied with the accessories specified at the time of ordering and 
validated in the order acknowledgement sent by ABB. 

 

The documents sent in the shipping packing are: 

Test Certification 

Packing List 

Other documents which are sent prior to shipment of the apparatus are: 

Order acknowledgement 

Original shipping advice notes 

Any drawings or documents referring to special configurations/conditions 

 

 

Summary of Contents for AutoLink

Page 1: ...TEHI95094 Rev 2 AutoLink 15kV 27kV 38kV Instruction Book ...

Page 2: ... must satisfy himself thoroughly that neither personal safety nor equipment safety will be jeopardized by the service method or tools selected For your safety Make sure that the installation area spaces divisions and ambient is suitable for electrical apparatus Check that all the installation putting into service and maintenance operations are carried out by personnel with suitable knowledge of th...

Page 3: ...Reception 4 4 Storage 5 5 Description 5 6 Installation 5 6 1 General 5 6 2 Installation and service conditions 5 6 3 Initial Setting or Previous Setting Modification Instructions 6 6 4 Dip Switch Configuration 7 6 5 AutoLink Repositioning 8 7 Commissioning 11 7 1 General procedures 11 8 Maintenance 11 ...

Page 4: ...apparatus is in armed position When performing a reception test it is required to wait 5 minutes with the device de energized after a tripping operation to reset it On reception check the state of the apparatus integrity of the packing and nameplate information is the same requested on the purchase order specifications Make sure that all materials described in the shipping note are included in the...

Page 5: ... with a upstream recloser Please take note that the AutoLink is not a fuse tripping device therefore it cannot be used as a protection device by itself The AutoLink Electronic Sectionalizer is designed ONLY to protect electrical equipment and NOT for saving people from accidents or electrocution when contacting energized circuits 6 Installation 6 1 General Correct installation is very important Th...

Page 6: ...and Fig 1 B Check condition of O ring Fig 2 E and replace it if necessary applying grease on it Set the dip switches to calibrate the current Fig 2 C 4 switches and set counting operations Fig 2 D 2 switches using a small screwdriver according to table 1 settings Note handle with care without damaging the switches Settings must be made in a clean and dry environment ...

Page 7: ...ration Once the calibration current and counts are set cover the dip switch with silicon grease Fig 3 supplied with AutoLink Check the condition of the O Ring Fig 2 E and apply silicon grease Fig 4 F both inside the cap and over the dip switches ...

Page 8: ...e between 8 and 10 Nm without damaging the O Ring Fig 5 6 5 AutoLink Repositioning Push the interlocking bolt Fig 6 until blocked it will rotate freely Do not strike the bolt nor use any type of tool to reset Turn the tensioning device support Fig 7 Place the tensioning device support facing the interlocking bolt ...

Page 9: ...TEHI95094 Rev 2 9 12 Turn the tripping pin 90 until the lower contact is firmly blocked Fig 8 Place the pole in the tube inferior eyelet Fig 9 and position in the cutout base ...

Page 10: ...TEHI95094 Rev 2 10 12 Withdraw the pole and place it in the tube s superior eyelet Fig 10 Push it until it remains in closing position ...

Page 11: ...r is made Check the closing system Check that the interlocking bolt turns freely The tensioning device support should move easily and the spring should be sufficiently tightened so that the support may reset when the system opens following the operation of the sectionalizer Check that the mobile lever and the lower support of the AutoLink move easily at the joint Clean and lubricate the joint surf...

Page 12: ...TEHI95094 Rev 2 12 12 Copyright 2013 ABB All rights reserved Document Title AutoLink Instruction Book Document No TEHI95094 EN Date Rev Ind Sep 2013 Rev 2 No of Pages 12 Page 12 ...

Reviews: