![ABB ACS880-17 User Manual Download Page 13](http://html1.mh-extra.com/html/abb/acs880-17/acs880-17_user-manual_3437522013.webp)
Introduction to the manual 13
Exclusion of liability
ABB is not responsible for the implementation, verification and validation of the overall
safety system. It is the responsibility of the system integrator (or other party) who is
responsible for the overall system and system safety.
The system integrator (or other responsible party) must make sure that the entire
implementation complies with all relevant standards, directives and local electrical code,
and that the system is tested, verified and validated correctly.
T1
Proof test interval. T1 is a parameter used to define the probabilistic
failure rate (PFH or PFD) for the safety function or subsystem.
Performing a proof test at a maximum interval of T1 is required to
keep the SIL capability valid. The same interval must be followed to
keep the PL capability (EN ISO 13849) valid. Note that any T1 values
stated cannot be regarded as a guarantee or warranty.
See also section
on page
IEC 61508,
EN/IEC 62061
TP
Test pulse
Abbreviation
Description
Reference
Summary of Contents for ACS880-17
Page 4: ......
Page 7: ...7 Document library on the Internet 57...
Page 8: ...8...
Page 34: ...34 Option description and instructions...
Page 48: ...48 Start up and acceptance test...
Page 56: ...56 Technical data...
Page 58: ...3AUA0000145921 Rev E EN 2018 02 02 Contact us www abb com drives www abb com drivespartners...