
14 EN – R6…R9 Quick installation guide
R0-
R4
R6-
R9
R6-
R9
EN
DA
DE
ES
FI
FR
IT
NL
PL
PT
RU
SV
TR
ZH
Connect the power cables
See figure
on page
. Use symmetrical shielded cable for motor cabling. If the
cable shield is the sole PE conductor for drive or motor, make sure that is has
sufficient conductivity for the PE.
1. Attach the residual voltage warning sticker in the local language next to the
control board.
2. Remove the side plates of the cable entry box: Remove the retaining screws (2a)
and slide the walls out (2b).
3. Remove the shroud on the power cable terminals by releasing the clips with a
screwdriver (3a) and pulling the shroud out (3b).
4. Knock out holes in the shroud for the cables to be installed.
5. Frames R8…R9: If you install parallel cables, also knock out holes in the lower
shroud for the cables to be installed
6. Cut an adequate hole into the rubber grommet. Slide the grommet onto the cable.
7. Prepare the ends of the input power cable and motor cable as illustrated in the
figure. If you use aluminum cables, put grease to the peeled aluminum cable
before connecting it to the drive. Two different motor cable types are shown in the
figures (7a, 7b).
Note:
The bare shield will be grounded 360 degrees. Mark the
pigtail made from the shield as a PE conductor with yellow-and-green color.
8. Slide the cables through the holes in the cable entry and attach the grommets to
the holes (the motor cable to the right and the input power cable to the left).
9. Connect the motor cable:
•
Ground the shield 360 degrees under the grounding clamp (9a).
•
Connect the twisted shield of the cable to the grounding terminal (9b).
•
Connect the phase conductors of the cable to terminals T1/U, T2/V and T3/W.
Tighten the screws to the torque given in the figure (9c).
Note:
Phase
conductors (R8, R9) are detachable.
10. Connect the input power cable as in step
. Use terminals L1, L2 and L3.
11. R8…R9: If you install parallel, install the second grounding shelf for the parallel
power cables. Repeat steps
...
12. Install the grounding shelf for the control cables.
13. Reinstall the shroud on the power terminals.
14. Secure the cables outside the unit mechanically.
15. See figure
on page
. Ground the motor cable shield at the
motor end. For minimum radio frequency interference, ground the motor cable
shield 360 degrees at the lead-through of the motor terminal box.
Summary of Contents for ACS580-01 Series
Page 6: ...2019 ABB Oy All Rights Reserved...
Page 10: ...10 R6 R9 Quick installation guide R0 R3 R6 R9 EN DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 20: ...20 R6 R9 Quick installation guide R0 R3 R6 R9 EN DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 22: ...2019 ABB Oy All Rights Reserved...
Page 30: ...30 EN Quick start up guide R0 R4 R1 R9 EN DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 34: ...34 3AXD50000009286 Rev F...