CHAPTER 7 – COMMISSIONING
112
—
7.4 Customer assistance
During the commissioning period, the customer is requested to
provide qualified personnel for assistance, who are
• experienced with medium and low voltage
equipment and with the local safety regula-
tions,
• familiar with the driven process,
• authorized to operate associated medium and
low voltage equipment (eg, main circuit
breaker, other low and medium voltage switch-
gear),
• authorized to operate the driven process for
functional tests.
7.5 Customer acceptance
When commissioning has been completed, the commissioning report
is signed by the responsible commissioning personnel and by the
customer as a sign of acceptance. A copy of the report and a copy of
the actual parameter settings are handed out to the customer.
Summary of Contents for ACS2000 AFE 1MVA
Page 6: ...170 Replacing filter mats 171 Phase modules location 171 Phase module Dimensions and weight ...
Page 8: ...Terms trademarks related documentation ...
Page 13: ...13 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Page 14: ...General information on manual and drive ...
Page 19: ...19 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Page 20: ...Important note on main circuit breaker ...
Page 48: ...Chapter 3 Control system 49 Overview 50 Main components 54 I O interfaces ...
Page 67: ...67 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Page 77: ...77 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Page 83: ...83 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J 5 1 3 2 1 4 A B C E D ...
Page 85: ...85 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Page 113: ...113 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Page 114: ...Commissioning check list ...
Page 149: ...149 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Page 176: ......