7.1
Safety
▲
DANGER
⚠
7.2
Overview of installation work
The electrical installation includes the following wire and cable connections:
- “7.5 Power cables, ground cables and equipotential bonding conductor” on page 89
- “7.6 Auxiliary power, control and serial communication cables” on page 98
- “7.7 Power supply cable for redundant fan unit” on page 104
7.3
Cable requirements
7.4
Cable entries
The cables can be entered through the roof or the floor of the cabinet.
The cabinet is equipped with one of the following cable entries:
- Cable entry with EMC plates
- Cable entry with sealing modules, type 1
- Cable entry with sealing modules, type 2
- Cable entry with cable glands
Hazardous voltage!
- Improper work could lead to life-threatening injury or death.
- The electrical installation must be carried out by qualified personnel according
to the site and equipment requirements, and the relevant electrical codes.
- When the electrical installation is completed, the main and auxiliary power
supply to the drive must not be switched on without the consent of the ABB
commissioning personnel.
- Take appropriate measures to prevent main and auxiliary power supply being
switched on during installation.
For information on the requirements for power cables, ground cable and
equipotential bonding conductor, see:
- Power cable specification
- Power cables engineering guideline
For information on the requirements for the auxiliary power cable and the control
cables, see the “Auxiliary power and control cables guideline”.
For information on location and dimensions, see
“Appendix C – Mechanical drawings”.
Summary of Contents for ACS 1013-A1
Page 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000 air cooled User manual ...
Page 3: ...Contents ACS1000 air cooled User manual ...
Page 5: ... 01 About this manual 01 3 14 ...
Page 16: ......
Page 17: ... 02 Important safety information 02 15 26 ...
Page 28: ......
Page 29: ... 03 Power electronics and cabinet features03 27 50 ...
Page 53: ... 04 Control system 04 51 66 ...
Page 68: ......
Page 69: ... 05 Transportation storage and disposal05 67 74 ...
Page 76: ......
Page 77: ... 06 Mechanical installation 06 75 82 ...
Page 84: ......
Page 85: ... 07 Electrical installation07 83 106 ...
Page 108: ......
Page 109: ... 08 Commissioning 08 107 112 ...
Page 115: ... 09 Operation 09 113 126 ...
Page 129: ... 10 CDP control panel 10 127 150 ...
Page 153: ... 11 Preventive and corrective maintenance 11 151 182 ...
Page 185: ......