22
Floor kit identification
Table 3. ACQ580-xP+C192 floor kits
Enclosure M3R-32W; Floor-Kit-3R-Irrigation-12Hx18D
Step 1:
Prepare ground mounting surface for enclosure.
Step 2:
Using a lifting device, carefully lay the enclosure on its back.
Drill ten (10) hoes with 7/16” drill bit.
Frame
Light Duty
HP
Enclosure
Designation
Floor Kit
6-Pulse; 208/240 Volt Ratings
R4
20
M3R-32W
Floor-Kit-3R-Irrigation-12Hx18D
(3AUA0000163767)
R5
30-40
R6
50
M3R-40W
Floor-Kit-3R-Irrigation-12Hx24D
(3AUA0000235652)
R7
60-75
R8
100
6-Pulse; 480 Volt Ratings
R4
40-60
M3R-32W
Floor-Kit-3R-Irrigation-12Hx18D
(3AUA0000163767)
R5
75
R6
100
M3R-40W
Floor-Kit-3R-Irrigation-12Hx24D
(3AUA0000235652)
R7
125-150
R8
200
ULH; 480 Volt Ratings
R6
40-60
M3R-40W
Floor-Kit-3R-Irrigation-12Hx24D
(3AUA0000235652)
R8
75-150