ACQ550-CC Packaged Drive with Bypass
7
Installation
Preparing for Installation
Lifting the Drive
Floor Mounting
Warning! Handle and ship floor mounted enclosures
only in the upright position. These units are not
designed to be laid on their backs.
1. Use a pallet truck to move the package/enclosure to the
installation site.
2. Remove andy bolts that secure the cabinet to the shipping
pallet.
Warning! Use the lifting lugs/bars at the top of the unit
to lift floor mounted drives.
3. Use a hoist to lift the drive. (Do not place drive in final
position until mounting site is prepared.)
PC00005
PC00003
30
o