EN – R1…R4 Quick installation guide 37
R1-
R4
R5
R6-
R9
EN
DA
DE
ES
FI
FR
IT
NL
PL
PT
RU
SV
TR
ZH
ZH
Connect the control cables
See figures
on page
. It shows an example with one analog signal cable
and one digital signal cable. Make the connections according to the default
configuration in use. The default connections of the HVAC default configuration are
shown in section
on page
.
4. Remove the front cover, if not already removed. See section
on page
.
Example of connecting an analog signal cable:
5. Cut an adequate hole into the rubber grommet and slide the grommet onto the
cable. Slide the cable through a hole in the cable entry and attach the grommet to
the hole.
6. Ground the outer shield of the cable 360 degrees under the grounding clamp.
Keep the cable unstripped as close to the terminals of the control board as
possible. Ground also the pair-cable shields and grounding wire at the SCR1
terminal.
7. Route the cable as shown in the figure.
8. Connect the conductors to the appropriate terminals of the control board and
tighten to 0.5…0.6 N·m (0.4 lbf·ft).
9. Tie all control cables to the provided cable tie mounts.
Summary of Contents for ACH580-01 Series
Page 1: ...HVAC ABB ACH580 01 R1 R5 3ABD00046115 A 3AXD50000044861 A 2018 06 15 R1 R4 R5 EN ZH...
Page 16: ...16 ZH R1 R4 R1 R4 R5 R6 R9 EN DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 27: ...ZH 27 R0 R4 R1 R9 ZH DA DE ES FI FR IT NL PL PT RU SV TR ZH Hand...
Page 30: ...30 ZH R0 R4 R1 R9 ZH DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 40: ...40 EN R1 R4 Quick installation guide R1 R4 R5 R6 R9 EN DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 50: ...50 EN R5 Quick installation guide R0 R4 R5 R6 R9 EN DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 60: ...60 R1 R4 R5 R6 R9 EN DA DE ES FI FR IT NL PL PT RU SV TR ZH...
Page 64: ...64 R1 R4 R5 R6 R9...
Page 66: ...66 R0 R4 R5 R6 R9...
Page 74: ...74 3AXD50000044861 Rev A...