04 Commissioning
ABB-free@home
®
22
│
System Manual
Creating the house structure (Fig. 16)
The first step of the configuration is the creation of the
house structure.
Here a digital image of the apartment or the house with all
its floors and rooms is created.
This information is used during the next step to allocate
the devices available in the house to a function and to
their mounting position.
After commissioning has been completed the floor plan
here created is also used for the visualization of the instal-
lation and as orientation for the switchable loads.
If devices are also to be switched outdoors, e.g. lights on
the terrace or in the garden, you should create a "Terrace"
or "Garden" room, to be able to position the devices there.
Summary of Contents for ABB-free home
Page 1: ...ABB free home System Manual ...
Page 2: ...2 System Manual ...
Page 19: ...ABB free home 04 Commissioning System Manual 19 Fig 13 Basic settings ...
Page 33: ...ABB free home 04 Commissioning System Manual 33 Fig 28 Panel ...
Page 75: ...ABB free home 08 FAQ und Tipps System Manual 75 ...