Operation Manual / A150-M56/66/57/67 - A155-M..
11 Dismantling and fitting, cartridge concept / 11.3 Removing the cart-
ridge group
© Copyright 2021 ABB. All rights reserved.
HZTL4032_EN
Rev.R
August 2021
Fig. 94: Removing cartridge group 2
1. Remove the centering bush (42193) and the threaded rod (42191) along with the clamping
nut (42201).
2. Remove and dispose of the O-rings (42195, 42200).
3. Attach the cartridge group to the service support (90012).
4. If present: Remove the metal C-ring (51105).
Page
141
/
198
Summary of Contents for A150-M67
Page 2: ......