![ABB 4630 Operating Instructions Manual Download Page 6](http://html.mh-extra.com/html/abb/4630/4630_operating-instructions-manual_4286006.webp)
4
68 (2.68)
214
(8.43)
232
(9.13)
Fixing Centres
160 (6.3)
250
(9.84)
69 (2.72)
Fixing Centres
Allowance for
Cable Bends
200 (7.9)
42
(1.65)
61 (2
3
/
8
) O.D. Vertical or Horizontal Post
Dimensions in mm (in)
Mark fixing centres
(see Fig. 3.2)
Drill suitable
holes
Secure instrument to
wall using
suitable fixings
1
2
3
Position ‘U’ bolts on pipe
Position plates over ‘U’ bolts
Secure transmitter to mounting plate
Secure plates
1
2
3
4
A – Wall-mounting
B – Pipe-mounting
…3
MECHANICAL INSTALLATION
Fig. 3.2 Overall Dimensions
Fig. 3.3 Wall-/Pipe-mounting
3.2
Mounting
3.2.1
Wall-/Pipe-mounted Instruments – Figs. 3.2 and 3.3
Summary of Contents for 4630
Page 37: ...35 NOTES ...
Page 38: ...36 NOTES ...