Operation Manual / A130-M.. - A145-M..
9 Dismantling and fitting / 9.21 Installing the gas outlet casing
© Copyright 2021 ABB. All rights reserved.
HZTL4031_EN
Rev.N
March 2021
9.21
Installing the gas outlet casing
Fig. 65: Installing the gas outlet casing
Product
Size
Tightening torque [Nm]
A130
M8
20
A135
M10
40
A140
M12
65
A145
M12
65
Table 46: Tightening torque (51009)
1. Insert a new gasket (61002) into the gas outlet casing (61001).
2. Coat the threads of the studs (51008) with high-temperature grease.
3. Attach the lifting gear to the gas outlet casing (61001) and position the gas outlet casing
in the correct position on the turbine casing (51000).
4. If present: Fit support (61301).
5. Fit hexagon nuts (51009). Observe the tightening torque.
Page
117
/
149