
INSTALLATION OF 1/2 - 4 INCH METERS
•
Install a gasket at meter inlet and
outlet, as applicable for meter type.
•
Insert meter (with gaskets) between
pipe flanges.
•
Insert two lower mounting studs with
adaptor sleeves between pipe
flanges.
•
Insert top two mounting studs and
sleeves (this will center the meter in
pipeline); install other mounting
studs, if required.
•
Thread nuts on studs. Use proper
torque and tightening sequence (i.e.
1-5-3-7, 2-6-4-8) to maintain even
pressure distribution as shown in
the figure to the right.
M
O
UNT
ING
PROCEDURE
FIGURE 5. Meter Mounting Diagram, 1/2 - 4 in. Sizes
ADAPTER SLEEVES
INSTALLATION INSTRUCTIONS
5