
MOUNTING PROCEDURE
INSTALLATION OF 1/10 - 3/8 INCH METERS
•
Align flange adapter on meter
body, as shown below.
•
Install a gasket at meter inlet and
outlet, as applicable for meter
type. Observe flow direction arrow.
•
Insert meter with (with gaskets)
between pipe flanges.
•
Insert mounting studs through bolt
holes.
•
Thread nuts on mounting studs
(finger tight).
•
Press down on flange adapter to
force-spread studs, thereby cen-
tering meter in pipeline.
•
Use proper torque and tightening
sequence (i.e. 1-3-2-4) to maintain
even pressure distribution as
shown in the figure to the right.
M
O
UNT
ING
PROCEDURE
FIGURE 4. Meter Mounting Diagram, 1/10 - 3/8 in. Sizes
ABB
3 - 10
(1/10 - 3/8)
NOTE: Meter shown is Model 10D1476/1477
INSTALLATION INSTRUCTIONS
4