background image

26

Sherborne Wood & Multifuel Stoves

INSTALLATION

CHECKLIST

Hearths, Fireplaces, Flues and chimneys

This checklist is to ensure hearths, fireplaces, flues and chimneys are satisfactory, and to show what you have done to comply with the 

requirements of The Building Regulations 2000 Approved Document J 2002. 

1.   Building address, where work has been carried out.......................................................................................................................................

.........................................................................................................................................................................................................................

2.  Identification of hearth, fireplace chimney or flue

3.  Firing capability: solid fuel/gas/.

4.  Intended type of appliance.

State model and output.

5.  Ventilation provisions for the appliance:

State type and area of permanently open vents.

6.  Chimney or flue construction

a)  State the type or make and whether new or existing.

b)  internal flue size (and equivalent height, where 

calculated - natural draught gas appliances only).

c)  If clay or concrete flue liners used confirm that they are

correctly jointed with socket end uppermost and 
state jointing materials used.

d)  If an existing chimney has been refurbished with a

new liner, type or make of liner fitted.

e)  Details of flue outlet terminal and diagram reference.

Outlet Details:

Complies with:

f)  Number and angle of bends.

g)  Provision for cleaning and recommended frequency.

7.  Hearth. Form of construction. New or existing?

8.  Inspection and testing after completion

Tests carried out by:
Tests and results

Flue

visual

inspection

sweeping

coring ball

smoke

Appliance (where included) spillage

I/we the undersigned confirm that the above details are correct. In my opinion, these works comply with the relevant requirements in
Part J of Schedule 1 to the Building regulations.

Print name and title....................................................................................................Profession..........................................................................

Capacity......................................................................................................................Telephone..........................................................................

Address............................................................................................................................................................Post code.......................................

Signed........................................................................................................Date.................................

Registered membership of..(e.g. CORGI, OFTEC, HETAS, NACE, NACS)............................................

Summary of Contents for Sherborne Large Multifuel

Page 1: ...Great Britain Tel 44 01308 427234 Fax 44 01308 423441 www aarrowfires com Wood Multifuel Stoves Operating Installation Manual PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE Sherborne Medium Mu...

Page 2: ...re so confident in the reliability of our product that we offer a Lifetime Guarantee Should you have any questions about our Sherborne range of stoves that are not covered in this manual please contac...

Page 3: ...12 Extended Burning 12 Over Firing 13 Ash Removal 13 SERVICING Cleaning Annual Maintenance 13 14 Accessories 15 INSTALLATION Page General Precautions 16 Handling 16 Hearth 16 Combustible Materials 16...

Page 4: ...ED IN THIS APPLIANCE TO USE THESE FUELS WILL INVALIDATE THE APPLIANCE GUARANTEE IF IN DOUBT CONTACT THE SOLID FUEL ASSOCIATION TELEPHONE NUMBER 0800 600 000 www solidfuel co uk THE USE OF SPARE PARTS...

Page 5: ...roperly installed and operated a house fire may result installation must comply with the Building Regulations and conform to all relevant fire safety standards Aarrow Fires produce a variety of applia...

Page 6: ...tplate 7 Operating tool 1 8 Rear liner 2 9 Side liners 2 N A Sherborne Medium Wood 2 1 1 5 1 2 2 Sherborne Medium Multifuel N A Sherborne Small Wood 1 5 1 2 2 9 2 1 1 5 1 2 2 Sherborne Large Wood N A...

Page 7: ...o Centre of Rear Flue Depth from Back to Centre of Flue mm Flue Diameter 127 5 Weight Packed Kg 2 8 Sherborne Medium Wood 9 127 5 Sherborne Medium Multifuel 1 5 6 Sherborne Small Wood 8 395 127 5 2 8...

Page 8: ...providing under draught to the base of the fire chamber through the controls on the doors of the fires PRIMARY AIR FOR SHERBORNE On the Sherborne primary air enters the appliance through the controls...

Page 9: ...ld and unlit The door s should be lifted off the hinges so that the below operations can be carried out on a workbench or similar level surface Unscrew the two nuts on the inside of the door securing...

Page 10: ...hinges Gently tap the two hinge pins in a direction to compensate for the misalignment Fig 9 Refit the door and check to ensure it now sits square to the body if not repeat above steps Fig 9 Adjusting...

Page 11: ...heat Blazebrite Taybrite Sunbrite Doubles Singles Anthracite Large Nuts and Welsh Dry Steam Coal Large Small Nuts Approval does not cover the use of other fuels either alone or mixed with the suitable...

Page 12: ...as for manufactured smokeless fuel Leave the air inlet control open about a quarter or less Note The high temperature paint acquires durability by being cured during the initial firings of the applia...

Page 13: ...se an injury Replace the ash pan and close the fire door CLINKER The formation of clinker suggests that the unit is being over fired Any clinker forming on the grate should be removed when cold OVER F...

Page 14: ...tainconditions such as burning at a low rate with damp wood or overnight burning the glass may become somewhat blackened To remedy this operate the appliance at a fast rate Alternatively when the stov...

Page 15: ...ns on add in boilers PAINT Matching aerosol paint to tone in any connecting flues pipes or surrounding metalwork TRACERIES Please note traceries will be available at a later date ADD ON CANOPIES Optio...

Page 16: ...on HEARTH The fire should be installed to stand on a constructional hearth of non combustible materials not less than 125mm 5 thick conforming to Building Regulations Dimensions of the hearth should p...

Page 17: ...long centre tab on the back edge rests on the rear liners The shorter turn down tabs against the vertical face Replace the front fuel retainer bars Note Neither the rear firebox liners nor the side f...

Page 18: ...ng end marked L onto the low section of the comb The upper bar is fitted in a similar manner but with the end marked L inserted in the rear channel and the end marked H seated on the high section of t...

Page 19: ...lation and are interchangeable These are fitted as follows To fit the interchangeable canopy Fig 10c Remove the front clamps Tilt the canopy as shown in stage 1 Engage the rear clips and pull fully fo...

Page 20: ...fumes from the stove outlet to the outside air To ensure a good updraught it is important that the flue gases are kept warm and that the flue size suits the stove The termination of the outlet at the...

Page 21: ...ument J of the Building Regulations for England and Wales is available from The Stationery Bookshops and can also be viewed at the ODPM website at www safety odpm gov uk bregs brads htm Details on the...

Page 22: ...22 Sherborne Wood Multifuel Stoves INSTALLATION...

Page 23: ...ULATED FLUES TYPICAL METAL INSULATED CHIMNEY SYSTEM TO BE INSTALLED TO THE CHIMNEY MANUFACTURERS INSTRUCTIONS IN COMPLIANCE WITH BUILDING REGULATIONS AND BS7566 PTS 1 4 A is minimum clearance for non...

Page 24: ...stems should be carried out by a qualified heating engineer In many cases your supplier will be able to offer advice and assistance Direct Systems Stainless steel boilers either factory fitted or retr...

Page 25: ...ipe from the expansion tank should be 28mm diameter copper Pipes in unheated spaces must be lagged FINAL CHECK Before handing over the installation to the customer it is strongly recommended that the...

Page 26: ...s appliances only c If clay or concrete flue liners used confirm that they are correctly jointed with socket end uppermost and state jointing materials used d If an existing chimney has been refurbish...

Page 27: ...roat Plate 3 Grate Bar Set 4 Hot Plate 5 Operating Tool 6 Ashpan 7 Flue Spigot Part Description Visual Aid not to scale Sherborne Small Wood Sherborne Small Multifuel Sherborne Medium Wood AFS1191 AFS...

Page 28: ...Glass Clips 13 Hinge kit Comprises 2 Hinges 4 Fixings Per Set 14 Airwash Curved Part Description Visual Aid not to scale Sherborne Small Wood Sherborne Small Multifuel Sherborne Medium Wood AFS1163 AF...

Page 29: ...skets Clips and Seal 19 Fire Door Locking Assembly 20 Wood Burning Tray 21 Multifuel Upgrade Kit Part Description Visual Aid not to scale SHBS MGRATE AFS1021 L H AFS1238 R H AFS1239 AFS1237 AFS1236 AF...

Page 30: ...a qualified heating engineer The Manufacturers decision shall be final If your appliance proves to be defective as a result of faulty materials or workmanship during guarantee we will repair or repla...

Page 31: ...is manual please contact your Aarrow retailer Please keep all repair receipts safely Please ensure you have this manual available when an engineer visits as they will complete the service record chart...

Page 32: ...I ve checked it and it s O K Assembled by Checked by Date of Purchase Name and address of supplier Please ensure installer completes INSTALLATION CHECK LIST details on page 26 of this manual If an add...

Reviews: