INSTALLATION

Primary flow and return pipes should be 28mm
diameter. The cylinder should be installed at a
higher level than the appliance, and as close to it as
possible (the higher the cylinder the faster the
circulation). The flow and return pipes should not
be longer than 20ft each. Pipe runs should rise
continually from the boiler to the cylinder. 
A radiator of approximately 25 sq.ft. should be
connected into the primary circuit, if installed in the
bathroom it provides a means of drying towels in
the summer.

Safety Vent Circuit

This circuit consists of a cold feed pipe, expansion
pipe, and expansion tank. The possibility that water
may boil can never be completely ruled out, and it
is therefore vital to ensure that cold water can be
supplied to the boiler and steam vented from it at all
times.

The expansion tank should have a capacity of at
least 7 % of the system's water capacity. The cold
water feed pipe should be at least 22mm diameter.

There must not be any shut off valves in the circuit.
Pipes should be run to avoid air locks. A spring
safety valve should be fitted to the expansion pipe
close to the boiler.

It is often possible, and is good practice, to utilise
the primary flow and return as part of the safety
circuit. The ball valve should have a copper ball.
The overflow pipe from the expansion tank should
be 28mm diameter copper. Pipes in unheated
spaces must be lagged.

FINAL CHECK

Before handing over the installation to the
customer it is strongly recommended that the
appliance is lit and the functioning of the chimney,
hot water and heating system is checked.

A checklist (Pre-lighting Checks) appears in the
Operating Instructions, but in addition to this the
installer should:

Operate the heating system and set the 

pump head.

Balance the radiators.

Re-vent and ensure no air locks.

Check the circulation round the primary 

system and the heat leak radiator, 
particularly when the pump is running, to  
ensure circulation is not reversed.

Be sure that the chimney is operating and 

that ALL smoke and fumes are vented to 
the atmosphere through the chimney 
terminal.

Check all joints and seals.

Clean the outside of the appliance to 

prevent any stains becoming burnt on.

Check the flue draught which should read 

1 - 2mm, or 0.1 - 0.2mbar.

The following details 

must

be checked and

completed in full by the installer at the time of
installation. Please answer all questions as fully as
possible. 

Arada Ltd

can not be held responsible

for chimney or installation.

HOT WATER SYSTEMS

Is the boiler cross-flowed?                   YES / NO
Are the pipes correctly sized?

YES / NO

What is the calculated output

required to heat the system? 
Is a heat leak fitted?

YES / NO

What is the return water temperature?

Is the pump thermostatically 
controlled by a pipe stat?

YES / NO

What is the height and distance of the 

hot water tank above the stove?

Summary of Contents for Sherborne Large Multifuel

Page 1: ...Great Britain Tel 44 01308 427234 Fax 44 01308 423441 www aarrowfires com Wood Multifuel Stoves Operating Installation Manual PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE Sherborne Medium Mu...

Page 2: ...re so confident in the reliability of our product that we offer a Lifetime Guarantee Should you have any questions about our Sherborne range of stoves that are not covered in this manual please contac...

Page 3: ...12 Extended Burning 12 Over Firing 13 Ash Removal 13 SERVICING Cleaning Annual Maintenance 13 14 Accessories 15 INSTALLATION Page General Precautions 16 Handling 16 Hearth 16 Combustible Materials 16...

Page 4: ...ED IN THIS APPLIANCE TO USE THESE FUELS WILL INVALIDATE THE APPLIANCE GUARANTEE IF IN DOUBT CONTACT THE SOLID FUEL ASSOCIATION TELEPHONE NUMBER 0800 600 000 www solidfuel co uk THE USE OF SPARE PARTS...

Page 5: ...roperly installed and operated a house fire may result installation must comply with the Building Regulations and conform to all relevant fire safety standards Aarrow Fires produce a variety of applia...

Page 6: ...tplate 7 Operating tool 1 8 Rear liner 2 9 Side liners 2 N A Sherborne Medium Wood 2 1 1 5 1 2 2 Sherborne Medium Multifuel N A Sherborne Small Wood 1 5 1 2 2 9 2 1 1 5 1 2 2 Sherborne Large Wood N A...

Page 7: ...o Centre of Rear Flue Depth from Back to Centre of Flue mm Flue Diameter 127 5 Weight Packed Kg 2 8 Sherborne Medium Wood 9 127 5 Sherborne Medium Multifuel 1 5 6 Sherborne Small Wood 8 395 127 5 2 8...

Page 8: ...providing under draught to the base of the fire chamber through the controls on the doors of the fires PRIMARY AIR FOR SHERBORNE On the Sherborne primary air enters the appliance through the controls...

Page 9: ...ld and unlit The door s should be lifted off the hinges so that the below operations can be carried out on a workbench or similar level surface Unscrew the two nuts on the inside of the door securing...

Page 10: ...hinges Gently tap the two hinge pins in a direction to compensate for the misalignment Fig 9 Refit the door and check to ensure it now sits square to the body if not repeat above steps Fig 9 Adjusting...

Page 11: ...heat Blazebrite Taybrite Sunbrite Doubles Singles Anthracite Large Nuts and Welsh Dry Steam Coal Large Small Nuts Approval does not cover the use of other fuels either alone or mixed with the suitable...

Page 12: ...as for manufactured smokeless fuel Leave the air inlet control open about a quarter or less Note The high temperature paint acquires durability by being cured during the initial firings of the applia...

Page 13: ...se an injury Replace the ash pan and close the fire door CLINKER The formation of clinker suggests that the unit is being over fired Any clinker forming on the grate should be removed when cold OVER F...

Page 14: ...tainconditions such as burning at a low rate with damp wood or overnight burning the glass may become somewhat blackened To remedy this operate the appliance at a fast rate Alternatively when the stov...

Page 15: ...ns on add in boilers PAINT Matching aerosol paint to tone in any connecting flues pipes or surrounding metalwork TRACERIES Please note traceries will be available at a later date ADD ON CANOPIES Optio...

Page 16: ...on HEARTH The fire should be installed to stand on a constructional hearth of non combustible materials not less than 125mm 5 thick conforming to Building Regulations Dimensions of the hearth should p...

Page 17: ...long centre tab on the back edge rests on the rear liners The shorter turn down tabs against the vertical face Replace the front fuel retainer bars Note Neither the rear firebox liners nor the side f...

Page 18: ...ng end marked L onto the low section of the comb The upper bar is fitted in a similar manner but with the end marked L inserted in the rear channel and the end marked H seated on the high section of t...

Page 19: ...lation and are interchangeable These are fitted as follows To fit the interchangeable canopy Fig 10c Remove the front clamps Tilt the canopy as shown in stage 1 Engage the rear clips and pull fully fo...

Page 20: ...fumes from the stove outlet to the outside air To ensure a good updraught it is important that the flue gases are kept warm and that the flue size suits the stove The termination of the outlet at the...

Page 21: ...ument J of the Building Regulations for England and Wales is available from The Stationery Bookshops and can also be viewed at the ODPM website at www safety odpm gov uk bregs brads htm Details on the...

Page 22: ...22 Sherborne Wood Multifuel Stoves INSTALLATION...

Page 23: ...ULATED FLUES TYPICAL METAL INSULATED CHIMNEY SYSTEM TO BE INSTALLED TO THE CHIMNEY MANUFACTURERS INSTRUCTIONS IN COMPLIANCE WITH BUILDING REGULATIONS AND BS7566 PTS 1 4 A is minimum clearance for non...

Page 24: ...stems should be carried out by a qualified heating engineer In many cases your supplier will be able to offer advice and assistance Direct Systems Stainless steel boilers either factory fitted or retr...

Page 25: ...ipe from the expansion tank should be 28mm diameter copper Pipes in unheated spaces must be lagged FINAL CHECK Before handing over the installation to the customer it is strongly recommended that the...

Page 26: ...s appliances only c If clay or concrete flue liners used confirm that they are correctly jointed with socket end uppermost and state jointing materials used d If an existing chimney has been refurbish...

Page 27: ...roat Plate 3 Grate Bar Set 4 Hot Plate 5 Operating Tool 6 Ashpan 7 Flue Spigot Part Description Visual Aid not to scale Sherborne Small Wood Sherborne Small Multifuel Sherborne Medium Wood AFS1191 AFS...

Page 28: ...Glass Clips 13 Hinge kit Comprises 2 Hinges 4 Fixings Per Set 14 Airwash Curved Part Description Visual Aid not to scale Sherborne Small Wood Sherborne Small Multifuel Sherborne Medium Wood AFS1163 AF...

Page 29: ...skets Clips and Seal 19 Fire Door Locking Assembly 20 Wood Burning Tray 21 Multifuel Upgrade Kit Part Description Visual Aid not to scale SHBS MGRATE AFS1021 L H AFS1238 R H AFS1239 AFS1237 AFS1236 AF...

Page 30: ...a qualified heating engineer The Manufacturers decision shall be final If your appliance proves to be defective as a result of faulty materials or workmanship during guarantee we will repair or repla...

Page 31: ...is manual please contact your Aarrow retailer Please keep all repair receipts safely Please ensure you have this manual available when an engineer visits as they will complete the service record chart...

Page 32: ...I ve checked it and it s O K Assembled by Checked by Date of Purchase Name and address of supplier Please ensure installer completes INSTALLATION CHECK LIST details on page 26 of this manual If an add...

Reviews: